Mains renewal around Long Meadow Drive in Sedgley

We will be replacing existing water mains with a new, high-performance plastic water mains to ensure a quality and reliable water supply.

When will the work take place? 

Work will take place on the following roads, between these dates:

Changes to traffic 

To complete the work as safely and efficiently as possible, we will be working in the carriageway with footpath closures in place. An alternative footpath route will be provided for pedestrians.

There will also be road closures in place on Long Meadow Drive, Greenslade Road, Westcroft Road and Lyndale Road.

Access to frontages will be maintained throughout the duration of the works and suitable diversion routes will be in place.